Skip to content
- Commissioning of power equipment rated up to and including 330 kV, protection and automation systems, and 0.4 kV networks
- Configuration of protective devices, overload limiters (OL), and devices in automatic process recording systems
- Configuring remote control devices in various modes and determining their adjustment range
- the presence of its own certified electrical engineering laboratory
- Administrative and Technical Department (management, project managers) – 15 people
- Design and Estimating Department (certified design engineers, chief design engineers, cost engineers) – 20 employees
- Production Department (foremen, supervisors, technical specialists) – 15 people
- Production workers – 30 people
- Experienced electricians specializing in power distribution networks and electrical equipment – 60 people
- Highly qualified technicians – 6 people