A list of projects that SMART BUD SOLUTIONS LLC has completed in recent years or is currently working on:

Reconstruction of transformer substations
Gaysin 110/6 kV Substation
Yampol 110/6 kV Substation
Lytyn 110/6 kV Substation
Murov Kurilivtsi 110/6 kV Substation

Technical Upgrade of the On-Site Electrical Networks at the “Ugersko” Booster Compressor Station (Construction Work and Routine Maintenance)


Repair of cable networks at GPA KC No. 1, Bibrka compressor station


Repair of cable networks at Bibrka compressor station, 10/0.4 kV transformer substation 2×1000 kVA, compressor shop No. 1, ASCS No. 4, 7, No. 11, No. 12, and control and protection circuits (Work related to completed or uncompleted construction projects and civil engineering structures)


Technical retrofitting of the 10 kV distribution point at the “Ternopil” compressor station (design work)


Technical retrofitting of the main station switchboard, control systems, and 220V, 24V DC switchboard of the “Rohatyn” compressor shop (design work)


Technical retrofit of the main station control panel and the 220V, 24V DC panels of the compressor shop at the “Ternopil” compressor station (design work)


Technical retrofitting of the 10 kV distribution substation at the “Ternopil” compressor station


Technical retrofitting of the main station control panel and the 220V, 24V DC panels at the “Ternopil” compressor station


Ремонт кабельних мереж ГПА КЦ №1 КС Бібрка


Ремонт кабельних мереж КС Бібрка КТП 10/0,4кВ 2х1000 кВА компресорного цеху №1, АЩСУ №4 7, №11, №12 та кіл управління та захисту (Роботи,пов’язані з об’єктами завершеного чи незавершеного будівництва таоб’єктів цивільного будівництва)


Технічне переоснащення розподільчого пункту 10 кВ компресорної станції “Тернопіль” (проектні роботи)


Технічне переоснащення загальностанційного щита, систем керування та щита постійного струму 220В, 24В компресорного цеху ” Рогатин” (проектні роботи)


Технічне переоснащення загальностанційного щита систем керування та щита постійного струму 220В, 24В компресорного цеху компресорної станції “Тернопіль” (проектні роботи)


Технічне переоснащення розподільчого пункту 10 кВ компресорної станції «Тернопіль»


Технічне переоснащення загальностанційного щита систем керування та щита постійного струму 220В, 24В компресорної станції “Тернопіль”

Renovation of the power supply system for Compressor Shop No. 2 at the Uzhgorod Compressor Station
Reconstruction of the 2×1000 complete transformer substation in Workshop No. 2 of the Uzhgorod Compressor Station
Reconstruction of the power supply system for the air-cooled gas unit at the Uzhgorod Compressor Station

Renovation of the 220V/27V DC system at the “Sumy” compressor station of the Sumy Linear Production Department of Main Gas Pipelines
Renovation of the electrical switchgear cabinets at the “Krasyliv” compressor station of the Krasyliv Linear Production Department of Main Gas Pipelines

Reconstruction of the 10 kV power line F-111 at the 35/10 kV “Peresyp” substation, the urban-type settlement of Kyrylivka, Akymivka District, Zaporizhzhia Oblast
Reconstruction of the 10 kV power line F-114 at the 35/10 kV “Peresyp” substation, the urban-type settlement of Kirylivka, Akymivka District, Zaporizhzhia Oblast
Reconstruction of electrical switchgear cabinets at the “Lubny” compressor station of the Lubny Linear Production Department of Main Gas Pipelines (construction work and routine maintenance)
Reconstruction of a two-transformer substation (2KTP 630) at the “Lubny” compressor station of the Lubny Linear Production Department of Main Gas Pipelines (construction work and routine maintenance)

New construction of a complex of buildings and structures: the “Bohny” photovoltaic power plant on land belonging to the Hruskovets Village Council. Power supply

Construction and routine maintenance of the 330 kV overhead line for the “Dnistrovska HPP” branch of PJSC “Ukrhydroenergo”

Renovation of the main power units (Nos. 2 and 3) at the Serednidniprovska HPP branch

Replacement of the electrical cabinet for the speed controller of Hydropower Unit No. 2 at the P.S. Neporozhny Kakhovka Hydroelectric Power Plant

Replacement of the 1C and 9C auxiliary switchboards and the TVP-1, T19, and T26 auxiliary transformers at the “P.S. Neporozhny Kakhovka HPP” branch
Reconstruction of the main switchgear of Unit No. 1 at the “Serednodniprovsk HPP” branch
Reconstruction. Phase II. 0.4–0.23 kV switchboards for the auxiliary power supply of units G1–G9, specifically for units G-1, G-2, and G-3 at the “Dniprovska HPP” branch
Reconstruction. Phase II. Adjustment. Replacement of power assemblies C1G, C2G, and C3G for the auxiliary power supply of units Hydraulic units No. 1, 2, 3 of the “Dniprovska HPP” branch
Replacement of 0.4 kV power assemblies C-309, C-310, C-628, C-629, C-631, C-636 of the “Dniprovska HPP” branch
Purchase and installation of 0.4 kV switchboards (43S, 44S) for the 110/330 kV switchgear of the “Kaniv HPP” branch

Unit No. 5. Unit renovation. Replacement of power transformer T5 at the Kaniv Hydroelectric Power Plant, a branch of PJSC “Ukrhydroenergo”

Renovation of Power Unit No. 2
Replacement of 330 kV busbar power equipment and 0.4 kV switchgear panels